Lead Times

Protolabs offers standard lead times for specific services. View lead times associated with each service line to help plan your project timeline


Injection Molding


Offerings Description Time
Parts
Small Parts Less than 3 in. x 2.5 in. (76.2mm x 63.5mm) 7 days (expedites in 1 day)
Standard Parts 5 in. x 5 in. – 14 in. x 12 in. (127mm x 127mm –355.6mm x 304.8mm) 15 days (expedites in 3 days)
Mega Mold Up to 18.9 in. x 29.6 in. x 8 in. (480.06mm x 751.84mm x 203.2mm) 20 days (can be less with expedites)
Secondary Options
Pad Printing Pad printing transfers a two-dimensional image onto a three-dimensional object. We will print designed images such as company logos on molded parts at Protolabs. + 5 days (repeat order)+ 10 days (first order)
Assembly Basic assembly at Protolabs includes fastening parts together that have been manufactured by Protolabs and/or applying labels to individually bagged parts. + 6 days
Laser Engraving Laser engraving is applied to parts only. Laser engraving includes information such as logos or part numbers. Laser engraving ensures crisp, consistent information on each part or serialization. + 5 days for parts
Mold Texturing Mold texturing involves applying industry standard textures to a mold. This includes texturing and/or engraving graphics or text into the mold cavity. +9 days for molds
Threaded Inserts Threaded inserts are possible through secondary heat staking and ultrasonic welding processes. Heat staking is the process of heating threaded inserts and press-fitting those inserts into molded part geometries. Ultrasonic welding uses high frequency acoustic vibrations to press-fit inserts into molded part geometries. + 5 days (repeat order)+ 10 days (first order)
Part Cleaning Washing or deep cleaning of parts by various methods, including ultrasonic cleaning, vapor degreasing, and ISO Class 7 clean room cleaning and packaging. + 12 days
Inspections
Quality Inspection Report Verifies Protolabs' manufacturing process controls. Protolabs selects up to four plane-to-plane and outside diameter dimensions based on your CAD model (X, Y, Z) to quoted tolerances. 0
Production Part Approval Process (PPAP) Production part approval process (PPAP) is a standardized process, typical within the automotive industry, that documents design quality and reproducibility. We offer many of the industry standard 19 steps—process FMEA, control plan, ISIR, and inspection reports. + 11 days
Digital Inspection Report Verify numerous dimensional specifications; up to 50 measurements. + 6 days
CTQ Partial FAI (First Article Inspection) Includes a 3-part dimensional first article inspection of critical features (Customer selects up to 5 features) 0
CTQ DIR with Capability Study Includes a 30-part dimensional capability study of critical features (Customer selects up to 5 features) 0

CNC Machining


Standard Lead Time 3 days
Expedites same-day, 1 day, 2 days (as available)
Economy Options 7 days, 12 days, 18 days (as available)
Lead Time Additions (business days)
Anodizing 5 days
Chromate 5 days
Dimensional Inspection report 3-7 days (manual quote needed)
NH Standard: parts within MN factory envelope. 10 in. x 7 in. x 3.75 in. (254mm x 177.8mm x 95.25mm) for soft metals/plastics, 10 in. x 7 in. x 1.75 in. (254mm x 177.8mm x 44.45mm) for hard metals 4 days + additions below
Lead Time Additions (in business days—each is added to lead time separately)
Black/clear anodizing 0 days
Clear/yellow chromate 0 days
Passivation 0 days
Color or type III anodizing 2 days
Hardware install 2 days
FAI 2 days
Zinc plating 2 days
Laser engraving 3 days
Powder coating 5 days
Black oxide 5 days
Masking requirements varies depending on quantity, complexity, etc.
Tin plating needs vendor quote
Heat treating needs vendor quote
Wet paint needs vendor quote
NH High Requirements 7 days
Lead Time Additions (same as above) same as above
Manufactured Globally
Expedited 11 days
Standard 14 days
Economy 23 days
Manufactured in the USA
Rapid 5 days
Expedited 9 days
Standard 13 days

3D Printing


Titanium NR 10 days
Titanium HR 5 days
SS 316 NR 10 days
SS 316 HR 5 days
SS 17-4PH NR 10 days
SS 17-4PH HR 5 days
Aluminum NR 10 days
Aluminum HR 5 days
Cobalt Chrome NR 10 days
Cobalt Chrome HR 5 days
Inconel NR 10 days
Inconel HR 5 days
PA12 Black 3 days
PA12 Natural 3 days
PA12 40% GF Black 3 days
PA12 40% GF Natural 3 days
PA12 40% GF (PA614-GS) 3 days
PA12 25% Mineral-filled (PA620-MF) 3 days
PA12 White (PA650) 3 days
PA11 Black (PA850) 3 days
Polypropylene Natural 5 days
TPU 70-A White 5 days
TPU 70-A Black 5 days
PC-Like Advanced High Temp Translucent Amber NR (Accura 5530) 3 days
PC-Like Advanced High Temp Translucent Amber HR (Accura 5530) 3 days
ABS-Like Black NR (Accura 7820) 3 days
ABS-Like Black HR (Accura 7820) 3 days
PP-Like Translucent White NR (Somos 9120) 3 days
PP-Like Translucent White HR (Somos 9120) 3 days
ABS-Like Translucent Clear NR (WaterShed XC 11122) 3 days
ABS-Like Translucent Clear HR (WaterShed XC 11122) 3 days
PC-Like Translucent Clear NR (Accura 60) 3 days
PC-Like Translucent Clear HR (Accura 60) 3 days
ABS-Like Gray NR (Accura Xtreme Gray) 3 days
ABS-Like Gray HR (Accura Xtreme Gray) 3 days
ABS-Like White NR (Accura Xtreme White 200) 3 days
ABS-Like White HR (Accura Xtreme White 200) 3 days
MicroFine Green 3 days
MicroFine Gray 3 days
Metal Plated Ceramic-Like NR (PerForm) 6 days
Metal Plated Ceramic-Like HR (PerForm) 6 days
True Silicone White 9 days
Digital Clear 3 days
Digital White 3 days
Digital Black 3 days
Digital Overmold 3 days
PP-Like Black Flexible Polyurethane (FPU 50) 3 days
ABS-Like Black Rigid Polyurethane (RPU 70) 3 days
Flame Retardant Black (EPX 86FR) 3 days
Vapor Smoothing +1 day for eligible materials
Thermal Cure for SLA (Accura 5530 and PerForm) +1 day for eligible materials

Sheet Metal Fabrication


Description ​ Express Select
Base Lead Time (Includes laser cutting, deburring, and forming​) 3 days 5 days
Secondary Operations​ Added Days to "Base"​
Hardware Insertion 0 days 1 day
Punch (formed features) 0 days 1 day
Machining 0 days 1 day
Assembly* 0 days 1-3 days
Finishing Operations​
Powder Coat 2 days 2 days
Plating/Coating** 2 days 2 days
Masking*** 1-2 days 1-2 days
Silkscreen 1 day 1 day
Part Marking 1 day 1 day
Inspection Documentation​
Dimensional Inspection (DIR) 1 day 1 day
First Article Inspection (FAI) 2 days 2 days
Other 
Material thicknesses >0.125 in. (3.175mm) n/a 1 day